Places

KMP (Kundli–Manesar–Palwal) Expressway

The 135 km KMP Expressway was completed when the PM opened the Kundli–Manesar section on 19 Nov 2018; Manesar–Palwal (52.33 km) opened in Apr 2016.

Corridor

Where it is

Six-lane, access-controlled ring road west and south of Delhi, from Kundli in Sonipat via Manesar to Palwal, through Sonipat, Jhajjar, Gurugram, Nuh (Mewat) and Palwal districts. About 135 km in all; the Manesar–Palwal part is 52.33 km. It crosses NH-48 near Manesar, NH-919 (Palwal–Sohna–Rewari), NH-248A (Sohna–Nuh–Alwar) and joins NH-2 (now NH-19) near Palwal.

Executed by the Haryana State Industrial and Infrastructure Development Corporation (HSIIDC), which also collects toll; the Haryana Cabinet approved tolling in Sep 2018 (as reported). Also called the Western Peripheral Expressway.

Plan position

The Gurugram-Manesar Final Development Plan 2031 reserves the KMP Expressway as a 100 m road with a 100 m green belt on both sides, and depicts fashion, world trade and entertainment hubs along it, to be detailed as per the Development Plan of KMP Global Corridor.

Official plan · Our note on the plan

Roads, rail and metro

Manesar–Palwal sectionopen
52.33 km, Rs 457.81 crore; inaugurated by Nitin Gadkari at Palwal (press release dated 5 Apr 2016). Source
Kundli–Manesar sectionopen
Inaugurated by the Prime Minister at Sultanpur, Gurugram, on 19 Nov 2018. Source
Toll plazasopen
Initial toll points included Sultanpur, Patli-Hazipur and Mokalwas/Fazliwas in Gurugram (as reported, 25 Sep 2018). Source
DND–Faridabad–KMP link (Delhi–Mumbai Expressway)partly open
59 km link from the DND Flyway to the Delhi–Mumbai Expressway via the Jaitpur–KMP interchange; last 9 km opened for trials from 22 Aug 2026 (as reported). Source

Land risks to check

  • Released acquisition land, agriculture only. Land that was under acquisition by the Industries Department along KMP was to go to the Agriculture Zone after release, on the condition that no CLU or licence is granted there. Source
  • Green belt. The plan keeps a 100 m green belt on both sides of the expressway in GMUC. Source

Questions worth asking about land along it

  • Does the parcel actually touch the road, or a service road, a green belt or a sector road shown on the plan?
  • Is any part of it inside land acquired or proposed for the road, a junction or a toll plaza?
  • Is it inside a notified TOD zone, and does that change what can be built?
  • Which village and tehsil is it in? The collector rate goes by village, not by road.

Properties here

No public listings here at the moment. Many requirements are matched privately: share your brief or offer a property.